← Back to OEM CapabilitiesFactory Capabilities
Shenzhen and Dongguan factory-side production coordination for winding, magnet assembly, epoxy potting, CNC/interface support, prototypes, and repeat production.
Best Fit For:Procurement and engineering teams qualifying a China-based source for frameless motor projects without needing to manage multiple factories directly.
Shenzhen / Dongguan Factory Coordination Model
Our factory-facing work is organized around long-term production relationships in the Shenzhen and Dongguan manufacturing cluster. This region gives access to motor winding, magnet handling, machining, fixture support, potting, inspection, and export logistics resources without forcing every project into one fixed public factory identity.
For buyers, the practical question is not the name on a workshop sign. The useful question is whether the selected production route can support the actual OD/ID geometry, winding target, magnet assembly, insulation requirement, outgoing checks, sample quantity, and repeat-order plan. We keep the website supplier-neutral so the route can match the project instead of locking every buyer into one source.
| Factory Area | Typical Role | Buyer Evidence |
|---|
| Motor kit work | Stator, rotor, winding, magnet assembly, and potting route coordination. | Process photos, sample records, and configuration notes by project scope. |
| Mechanical support | Interface parts, mounting details, fixture discussion, and assembly-risk review. | Drawing revision, tolerance notes, and sample fit-check feedback. |
| Quality checks | Resistance, back EMF, insulation, visual checks, outgoing records, and project-specific test planning. | Example test formats and outgoing record scope before production release. |
| Export execution | Packaging, shipment cadence, document preparation, and cross-border communication. | Delivery plan, packaging notes, and PO milestone communication. |
Factory Evidence Package for Qualified RFQs
Instead of publishing supplier names, fixed addresses, or workshop signs, buyers can request project-relevant evidence tied to the quoted scope. This keeps supplier routing flexible while still giving engineering and procurement teams material for internal qualification.
| Evidence Type | What It Shows | When to Request |
|---|
| Neutral process photos | Winding, magnet assembly, potting, inspection, packaging, or sample preparation without supplier identity exposure. | Before sample PO or when procurement needs factory-side confidence. |
| Sample configuration record | Drawing revision, winding direction, lead exit, sensor option, and scope tied to the sample. | Before sample approval and before any design change discussion. |
| Example outgoing check format | Resistance, back EMF, insulation, hi-pot, visual, and packaging checks that can be agreed by project. | Before pilot or repeat-production release. |
| Production-route note | Which work is coordinated through winding, magnet, machining, potting, testing, and export support routes. | When buyer qualification requires supply-chain explanation without public factory disclosure. |